How it works
Begin with the loss you can plan for in account currency. Divide that budget by the loss per tradable unit at the stop, including the appropriate cost estimate. Round down to the size increment the venue accepts.
Use these examples for education and planning. Actual execution and costs can change results.
Worked example
On a 10,000 account, 1% gives a 100 risk budget. If one contract would lose 45 including costs, two contracts use 90 of the budget.
Sources and verification
The US SEC resource illustrates order mechanics. Check the rules and execution terms on the venue you use.